How Long Does EV Charger Installation Take?

It’s one of the most practical questions we get from EV owners: how long will the installation take, and will I be without power?

The straightforward answer: 2–4 hours for a standard residential EV charger installation.

The Standard Installation: 2–4 Hours

If your home has a modern switchboard with circuit breakers and RCDs, available space for a new 32A circuit, a straightforward cable route, and a short-to-medium cable run (under 20 metres), a 7kW EV charger installation is typically a 2–4 hour job.

During this time, your power will be off for approximately 30–60 minutes while the new circuit is connected at the switchboard. You’ll be back to full power well before end of day.

What Makes an Installation Take Longer?

Switchboard upgrade required

If your switchboard needs upgrading — ceramic fuse board, no RCD protection, or no spare positions — the job becomes a full day’s work. A switchboard upgrade alone takes 4–6 hours. Combined with the EV charger installation, plan for a full working day (approximately 8am–4pm).

Long or complex cable run

If the cable route goes through a concrete slab, spans more than 20–30 metres, or requires surface-mounted conduit over a long external run, additional time and materials are needed. A particularly long or complex run can add 1–3 hours.

Does the Whole House Lose Power?

StagePower status
Cable routing and charger mountingPower on (other circuits unaffected)
Connecting new circuit at switchboardWhole house off (~30–60 min)
Testing and commissioningPower on

What Happens After the Installation?

Once complete: we test the installation against AS/NZS 3000:2018, walk you through the charger’s operation, issue your Certificate of Testing and Compliance, and submit the ENERGEX or ERGON Energy notification if not already done.

GTG Electrical installs EV chargers across Sunshine Coast, Greater Brisbane, and Hervey Bay. Saturday installations are available for residential jobs.