If you’re installing an EV charger in South East Queensland, there’s a regulatory step most people don’t know about: ENERGEX notification. Here’s what it means, why it’s required, and what actually happens in practice.
Who Is ENERGEX?
ENERGEX is the electricity distribution network operator for South East Queensland — they own and operate the poles, wires, and infrastructure delivering electricity to your home. When significant new loads connect to the network, ENERGEX needs to know.
For Hervey Bay and the Fraser Coast, the relevant distributor is ERGON Energy, not ENERGEX. This is a critical distinction — they are entirely separate organisations serving different parts of Queensland.
When Does ENERGEX Notification Apply?
Under the Queensland Electricity Connection Manual (QECM), a basic connection application is required when a new load exceeds certain thresholds. For EV chargers, ENERGEX requires notification for installations drawing more than 20 amps single-phase or 40 amps three-phase.
In practice, this means:
- 7kW single-phase charger (draws ~32A) — Notification required
- 22kW three-phase charger (draws ~32A per phase) — Notification required
- Standard 10A travel cable on existing power point — No notification required
Almost every wall-mounted EV charger installation in Queensland triggers the notification requirement.
What Does the Notification Process Actually Involve?
The notification process is managed by your licensed electrician — not by you. It’s included in the installation job:
- Your electrician submits a Basic Connection Application to ENERGEX before the charger is energised
- ENERGEX reviews the application — for standard residential installs in areas with adequate capacity, this is typically straightforward
- ENERGEX may impose controlled load tariff conditions to protect network capacity
- Once approved, the charger is energised
The Controlled Load / Off-Peak Tariff
ENERGEX may require your EV charger be connected to a controlled load circuit — meaning ENERGEX can manage when it draws power during peak demand. In practice, controlled load periods are overnight, which is exactly when most EV owners charge. And controlled load tariffs (Tariff 31/33) carry lower electricity rates — you pay less per kWh for overnight charging.
What If Your Electrician Skips the Notification?
Some electricians skip the ENERGEX notification to save paperwork. Don’t let yours do this. If ENERGEX identifies an unnotified EV charger connection, consequences can include: requirement to disconnect and re-submit, issues with your Certificate of Testing and Compliance, and insurance implications.
ERGON Energy — Hervey Bay and Fraser Coast
If your property is in Hervey Bay, Maryborough, or the Fraser Coast, you’re in ERGON Energy territory — not ENERGEX. The notification process is equivalent but administered through ERGON’s systems. GTG Electrical operates in the Hervey Bay region and handles ERGON Energy notifications as part of every installation.
What GTG Electrical Handles for You
When GTG Electrical installs your EV charger, the ENERGEX or ERGON Energy notification is included in the job. We submit the connection application, handle any correspondence with the distributor, advise on controlled load tariff options, and ensure the charger is only energised after required approvals are in place.
At job completion you receive a Certificate of Testing and Compliance and confirmation of the ENERGEX/ERGON notification for your records.
GTG Electrical serves Sunshine Coast, Greater Brisbane, and Hervey Bay.