7kW vs 22kW EV Charger: Which One Do You Actually Need?

When you start researching home EV chargers, you’ll quickly run into two numbers: 7kW and 22kW. The 22kW sounds better — more power, faster charging. But for most Queensland homeowners, it’s not the right choice. Here’s why.

What the Numbers Actually Mean

These numbers refer to the maximum charging power the unit can deliver. A 7kW charger running for 8 hours adds approximately 56kWh — enough to fully charge most EVs on the market today. A 22kW charger running for the same 8 hours adds 176kWh — far more than any current passenger EV can store.

The key word is maximum. Your EV will only accept what its onboard charger can handle — and most passenger EVs have an onboard AC charger limited to 7–11kW. Plugging into a 22kW unit doesn’t charge it any faster.

The Phase Supply Problem

7kW chargers run on single-phase power. 22kW chargers require three-phase power.

Single-phase power is what approximately 85–90% of Queensland homes have. Three-phase is typically found in rural properties on larger blocks, some newer high-end residential builds, and commercial properties.

To use a 22kW charger, you need three-phase supply. If you don’t have it, you’d need to apply to ENERGEX (SEQ) or ERGON Energy (Hervey Bay / Fraser Coast) for a three-phase connection upgrade — involving network costs, trenching, and timeframes that can stretch to months.

Does Your EV Even Support 22kW AC Charging?

Most don’t. Here’s what popular Australian EVs accept on AC home charging:

VehicleMax AC Charging Rate
Tesla Model 3 / Y11kW (three-phase)
BYD Seal / Atto 37kW (single-phase)
MG ZS EV / MG47kW (single-phase)
Hyundai IONIQ 611kW (three-phase)
Kia EV611kW (three-phase)
BMW iX11kW (three-phase)
Renault Zoe22kW (three-phase)

Real-World Charging Times

Using a 60kWh battery charged from 20% to 100%:

ChargerEffective rateTime to charge
7kW single-phase7kW~6.8 hours
11kW three-phase11kW (if vehicle accepts)~4.4 hours
22kW three-phase7–11kW (limited by vehicle)~4.4–6.8 hours

A 22kW charger connected to a vehicle limited to 7kW gives you the same charging time as a 7kW charger — but costs more and requires three-phase supply.

When Would You Choose 22kW?

  • You already have three-phase power at your property
  • You own a Renault Zoe or another vehicle with a 22kW onboard charger
  • You’re installing chargers for fleet/commercial use
  • You drive very high daily kilometres and need the fastest possible overnight charge

For a private home with a single EV and standard usage: 7kW single-phase is the right answer 90% of the time.

What GTG Electrical Recommends

Before committing to any charger, we check: what vehicle you have, what your current phase supply is, and your switchboard condition. The answers determine the right charger. There’s no point paying for capacity your vehicle can’t use.

GTG Electrical installs EV chargers across Sunshine Coast, Greater Brisbane, and Hervey Bay.